If all goes as planned Thursday the traffic will be switched back on to US 77 between McFarland Roadd and Rucker Road with the eastside K-18 ramps closed to traffic. This all ties in with the work to improve the US 77 – K-18 interchange.
KDOT reported that the speed limit will remain 40 MPH as posted on US 77. There may be times during the next phase of construction that the ramps will be utilized during daylight hours only or a flagger operation on US 77 to allow the bridge contractor access under the bridge.